Intro from Malaysia - WR7002 - C304
-
- Posts: 481
- Joined: Sat Aug 21, 2010 8:48 pm
- Location: Malaysia
- Contact:
Re: Intro from Malaysia - WR7002 - C304
12 13 14 March 2021
Front painted. Then i see the run and and the fix ruins the valance under the window sigh this will be fixed later. I cannot paint the front bumper as it's holding the the truck up with a giant stand.
Right frame undercoated.
The alloy door panels are now ready to attach. However the door tops still need attention.
Up with the floor now to paint the frame black with epensive single all in one paint. Then we find the shrew squirrels have been using the fuel tank as a
dining room sigh. So I start building a shrew fence from the firewall frame from a LandRover 109 lying in the workshop.
Front painted. Then i see the run and and the fix ruins the valance under the window sigh this will be fixed later. I cannot paint the front bumper as it's holding the the truck up with a giant stand.
Right frame undercoated.
The alloy door panels are now ready to attach. However the door tops still need attention.
Up with the floor now to paint the frame black with epensive single all in one paint. Then we find the shrew squirrels have been using the fuel tank as a
dining room sigh. So I start building a shrew fence from the firewall frame from a LandRover 109 lying in the workshop.
-
- Posts: 481
- Joined: Sat Aug 21, 2010 8:48 pm
- Location: Malaysia
- Contact:
Re: Intro from Malaysia - WR7002 - C304
19 20 21 March 2021
The frame looks good.
So do the door bottoms.
I finally finish the front half of the frame.
and start to prepare the rear. Sound proofing also commences to stop the rattles emerging from the floor.
and give it the magic one coat paint.
Then its time to start testing the truck facilities the hammock test and fan test are conducted
The rear panel is prepped and undercoated
The frame looks good.
So do the door bottoms.
I finally finish the front half of the frame.
and start to prepare the rear. Sound proofing also commences to stop the rattles emerging from the floor.
and give it the magic one coat paint.
Then its time to start testing the truck facilities the hammock test and fan test are conducted
The rear panel is prepped and undercoated
-
- Posts: 481
- Joined: Sat Aug 21, 2010 8:48 pm
- Location: Malaysia
- Contact:
Re: Intro from Malaysia - WR7002 - C304
28 29 30 March 2021
I needed a new workbench so the frame being made for the indoor restaurant for 350k away which got cancelled is recycled into a new all purpose work table by hotpants.
Meantime I paint the inside of the doors.
Work claims the weekend sigh.
I needed a new workbench so the frame being made for the indoor restaurant for 350k away which got cancelled is recycled into a new all purpose work table by hotpants.
Meantime I paint the inside of the doors.
Work claims the weekend sigh.
-
- Posts: 481
- Joined: Sat Aug 21, 2010 8:48 pm
- Location: Malaysia
- Contact:
Re: Intro from Malaysia - WR7002 - C304
4 April 2021
I lift the floor over the fuel tank and oh no the damn shrew has had covid parties on the fuel tank again along with his friends. Now I'm pissed, I'm waiting for the rest of the fence to be tigged up. I now feel like Bill Murray in Caddyshack. Further lockdown can only travel inside our district - lucky the Volvo workshop is inside the district.
The soundproofed floor is ready to install.
Office work takes the rest of the weekend
I lift the floor over the fuel tank and oh no the damn shrew has had covid parties on the fuel tank again along with his friends. Now I'm pissed, I'm waiting for the rest of the fence to be tigged up. I now feel like Bill Murray in Caddyshack. Further lockdown can only travel inside our district - lucky the Volvo workshop is inside the district.
The soundproofed floor is ready to install.
Office work takes the rest of the weekend
-
- Posts: 481
- Joined: Sat Aug 21, 2010 8:48 pm
- Location: Malaysia
- Contact:
Re: Intro from Malaysia - WR7002 - C304
11 April 2021
Part 1 of 3 of the shrew fence is installed.
Part 1 of 3 of the shrew fence is installed.
-
- Posts: 481
- Joined: Sat Aug 21, 2010 8:48 pm
- Location: Malaysia
- Contact:
Re: Intro from Malaysia - WR7002 - C304
25 April 2021
cannot wait the floor is reinstalled so I can strip the service hatch down ready to be one coat black.
12 May 2021
Lights and fan testing continues to see current draw on the 150amp deep cycle battery.
cannot wait the floor is reinstalled so I can strip the service hatch down ready to be one coat black.
12 May 2021
Lights and fan testing continues to see current draw on the 150amp deep cycle battery.
-
- Posts: 481
- Joined: Sat Aug 21, 2010 8:48 pm
- Location: Malaysia
- Contact:
Re: Intro from Malaysia - WR7002 - C304
16 May 2021
I share lunch each sunday with Zinc he's getting good at it. He's not as cute as he looks he took a piece of 4 people in one day drawing blood on 2 including the owner. I have scars on my arm from an incident. If he is not wagging his tail and watching your hand do not touch him.
Full fan and lights test continues and the service hatch is now black and drying for 24 hours.
I share lunch each sunday with Zinc he's getting good at it. He's not as cute as he looks he took a piece of 4 people in one day drawing blood on 2 including the owner. I have scars on my arm from an incident. If he is not wagging his tail and watching your hand do not touch him.
Full fan and lights test continues and the service hatch is now black and drying for 24 hours.
-
- Posts: 481
- Joined: Sat Aug 21, 2010 8:48 pm
- Location: Malaysia
- Contact:
Re: Intro from Malaysia - WR7002 - C304
22 23 May 2021
Work now commences on preparing the flexible solar panel it will magnetic stick to the service hatch panel. I have 2 more for the new boat project which has the cut list prepared and waiting to be routed out in Singapore in coming 2 weeks.
I paint the 2 indoor panels which I missed.
Work now commences on preparing the flexible solar panel it will magnetic stick to the service hatch panel. I have 2 more for the new boat project which has the cut list prepared and waiting to be routed out in Singapore in coming 2 weeks.
I paint the 2 indoor panels which I missed.
-
- Posts: 481
- Joined: Sat Aug 21, 2010 8:48 pm
- Location: Malaysia
- Contact:
Re: Intro from Malaysia - WR7002 - C304
26 May 2021
Then it's time for the panels all to be bolted back to the truck the change in the trucks appearance is now amazing. So it will now pass the inspection rules of ONE colour.
I manage to do my first wet camp site test with the chair inside the truck and lights and fan running. Perfect all passed.
Left side panels attached
It may be extra time etc for me to paint the interior but its been worth it. Just the ceiling to paint in the coming weeks.
Then it's time for the panels all to be bolted back to the truck the change in the trucks appearance is now amazing. So it will now pass the inspection rules of ONE colour.
I manage to do my first wet camp site test with the chair inside the truck and lights and fan running. Perfect all passed.
Left side panels attached
It may be extra time etc for me to paint the interior but its been worth it. Just the ceiling to paint in the coming weeks.
Re: Intro from Malaysia - WR7002 - C304
The truck looks amazing. Near to the point where you can drive it.... After all this time, you are going to wonder if you have finished everything and when you can actually call it finished!
John
John
Admin for www.thehaflinger.com
-
- Posts: 481
- Joined: Sat Aug 21, 2010 8:48 pm
- Location: Malaysia
- Contact:
Re: Intro from Malaysia - WR7002 - C304
Up until we took the wheels off it was driveable just didn't wanna stop once you got to 3rd gear lol.
I only have to do:
finish painting
make tacho work via new alternator
fit new window frame runners
make rollout kitchen
finish solar panel
rebuy a 12v huge electric winch and install
connext up mppt solar controller and test
REGISTRATION inspection
-
- Posts: 481
- Joined: Sat Aug 21, 2010 8:48 pm
- Location: Malaysia
- Contact:
Re: Intro from Malaysia - WR7002 - C304
NO!!!!!!!!!!! the lockdown is extended till 28th June and then another 2-3 weeks after that to be allowed to open the workshop up, They cannot get a permit to open the workshop sigh.
Re: Intro from Malaysia - WR7002 - C304
Shame!
Still, gives you time to get your health in as good a shape as possible for when you can drive it.
John
Still, gives you time to get your health in as good a shape as possible for when you can drive it.
John
Admin for www.thehaflinger.com